What this planner covers
A typical room refresh touches three materials that all depend on the same measurements: wall paint, flooring and baseboard. Instead of typing the room size into three calculators, enter it here once. The planner assumes a simple rectangular room, one flooring type and baseboard on every wall except across door openings.
A sensible order of work
- Paint first. Ceilings and walls are easier to paint before new flooring goes in, and drips land on a floor you are about to replace.
- Flooring next. Many floating floors must acclimate and need an expansion gap at the walls, so check the manufacturer's instructions before you start.
- Baseboard last. It sits on top of the finished floor and covers the expansion gap. Prime and paint the boards before you cut them to save time on touch-ups.
Your project may call for a different order, for example if you are refinishing a hardwood floor, which is usually sanded before the final coat of wall paint.
Before you buy
- Check the coverage on the paint can and the square feet per box on the flooring carton. Both vary by product, and you can enter the real figure on the full calculator through each step's link.
- Buy all the flooring from one lot if the carton shows a lot or dye number, since color can vary between lots.
- For homes built before 1978, assume painted surfaces may contain lead and follow EPA lead-safe practices before sanding or removing old trim.
Frequently asked questions
Does the planner work for an L-shaped room?
Not directly, because it assumes one rectangle. Split the room into rectangles and use the full flooring calculator, which takes up to three areas, or run the planner once per section.
Can I save the results?
Yes. Press "Add all to project list" to save every step in this browser, then print the project list or copy it as text.